Prefabricated House Building Frame Construction Hotel Steel Structure

Product Details
Customization: Available
Material: Steel Structure
Product Name: Large Span Frame Construction Design Prefabricated

360° Virtual Tour

Diamond Member Since 2017

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

to see all verified strength labels (14)
  • Prefabricated House Building Frame Construction Hotel Steel Structure
  • Prefabricated House Building Frame Construction Hotel Steel Structure
  • Prefabricated House Building Frame Construction Hotel Steel Structure
  • Prefabricated House Building Frame Construction Hotel Steel Structure
Find Similar Products

Basic Info.

Model NO.
005
Column and Beam
Hot Rolled or Welded H Section, I Section
Surface Processing
Painted or Galvanized
Steel Grade
Q235B, Q345b
Roof & Wall Panel
PU, EPS, Rock Wool/Fiber Glass Sandwich Panel
Window and Door
PVC or Aluminum Alloy;Sliding Door or Rool up Door
Service Life
More Than 50 Years
Drawing
Design The Drawing as Your Demand
Installation
Engineer Helps to Instruct Installation
Keyword
Steel Workshop
Usage
Workshop
Certification
ISO
Customized
Customized
Transport Package
According to Customers′ Demands.
Specification
Custom-Made
Trademark
DFX
Origin
Qingdao, China
HS Code
9406900090
Production Capacity
60000 Sqm/Month

Product Description

 

Prefabricated House Building Frame Construction Hotel Steel Structure
 

2.  Specification

Main Steel Frame

Q235 Q345 H Section Steel Beam and Columns, Painted or Galvanized, 

Galvanized C Section or Steel Pipe

Secondary Frame Galvanized C Purlin , Steel Bracing , Tie Bar , Knee Brace , Edge Cover etc.
Roof Panel

EPS Sandwich Panel , Glass Fiber Sandwich Panel , Rock Wool Sandwich 

Panel , and Pu Sandwich Panel or Steel Sheet

Wall Panel Sandwich Panel or Corrugated Steel Sheet
Tie Rod Circular Steel Tube
Brace R ound Bar
Knee Brace Angle Steel
Door Sliding Sandwich Panel Door or rolling Metal Door
Connecting Post Feet Bolts, Intensive Bolt , Intensive Bolt
Packing According to The Pack List Made by Our Engineer
Drawing We Can Make the Design and Quotation According to Your Require or Your Drawing

3. Characteristics
1. Wide span: single span or multiple spans, the max span is 36m without middle column

2. Low cost and maintenance: unit price range from USD35/m2 to USD70/m2 according to customers request
3. Fast construction and easy installation: time saving and labor saving
4. Long using lifespan: up to 50 years
5. Nice appearance
6. Others: environmental protection, stable structure, High quake-proof, water proof and fire proof, and energy conserving.

Product Show

Prefabricated House Building Frame Construction Hotel Steel Structure
Prefabricated House Building Frame Construction Hotel Steel Structure

Main Material
Prefabricated House Building Frame Construction Hotel Steel Structure


Prefabricated House Building Frame Construction Hotel Steel Structure

Prefabricated House Building Frame Construction Hotel Steel Structure
FAQ

Q1. You are manufacture factory or trading company?
       A: We are manufacture factory. And you are welcomed to visit us for inspection. The quality control flow will show you ourprofessional. Also you will enjoy the best price and competitive price. 
Q2. Is your price competitive with other companies?
      A: Our business objectives are to give the best price with same quality and best quality with the same price. We will do everything we can to reduce your cost.
Q3. Do you offer service for installation?
      A: We will give detailed installation drawings and video for free. And if you need, we could send engineers as installation director even a team.
Q4. Do you accept container loading inspection?
       A: You are welcomed to send an inspector, not only for the container loading, but any time during the production time.
Q5. Do you offer designing service for us?
       A:Yes, we could design full solution drawings as your requirements. They use software such as Auto CAD, PKPM, MTS, 3D3S, etc. we will be glad to establish sincere business cooperation with you in the near future
Q6. What is the delivery time?
       A: Delivery time depends on order quantities. Generally, the delivery time will be 30 days after receiving deposit.
Q7. How can you get a quotation for your projects?
       A: You can chat with me anytime via Trade Manager to offer me your detail information or you can just fill out our questionaire(through my email below)and send back to us. We will give you the best quotation ASAP. Thanks for your kind cooperation.
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier