Hot Sale Warehouse Steel Frame Structure Prefab Building
Product Description
Steel structure workshop is widely used in all kind of manufacture factories. Based on different usage, steel workshop can be large span, multiple stories, high rise, etc. Steel structure workshop is made from steel structure systems, composed by H section steels for both columns and beams, and connected by high strength bolts for main steel structures. And cladding systems like sandwich panels or corrugated steel sheets are connected to the main steel structure by steel purlins. Ventilators are used for fresh air to come and sunlight panels and windows used for light to come in. For steel structure workshops, overhead crane will be adopted for lifting heavy steel materials. Sandwich panel sliding doors or automatic roller doors are the options for steel structure workshop doors.
![Hot Sale Warehouse Steel Frame Structure Prefab Building](//www.micstatic.com/athena/img/transparent.png)
Main component
Main Steel Frame
|
H section steel beam and columns, painted or galvanized, galvanized C section or steel, All Bolts Connection
|
Secondary Frame
|
hot dip galvanized C purlin , steel bracing , tie bar , knee brace , edge cover etc.
|
Roof Panel
|
Single Corrugated Steel Sheet or PU/EPS/FIberglass/Rockwool Sandwich Panel
|
Wall Panel
|
Single Corrugated Steel Sheet or PU/EPS/FIberglass/Rockwool Sandwich Panel
|
Ventilation System
|
Turbine Ventilator; Ridge Ventilator; Windows, Doors
|
Lighting Sytem
|
FRP Skylight Belt; PC Hollow Sunshine Board;
|
Accessories
|
High Strength Bolt; Ordinary Bolt; Self tapping nail etc;
|
Main Features
1 Fast Construction and Easy Installation; Save time and Labor;
2 Long Life Time Over 50 years;
3 Prefabricated and Customized Design;
4 Strong, stability, Durability and Aesthetics;
5 Environmental friendly, can be recycled used;
6 Quake Proof; Water Proof;
7 Larger Interior Space;
8 Lower Maintenance Cost;
Product pictures
![Hot Sale Warehouse Steel Frame Structure Prefab Building](//www.micstatic.com/athena/img/transparent.png)
Ventilation Sytem: FRP Skylight Belt & PC Hollow Sunshine Board![Hot Sale Warehouse Steel Frame Structure Prefab Building](//www.micstatic.com/athena/img/transparent.png)
Ventilation Sytem: Turbine Ventilator & Ridge Ventilator ![Hot Sale Warehouse Steel Frame Structure Prefab Building](//www.micstatic.com/athena/img/transparent.png)
Sandwich Panels
![Hot Sale Warehouse Steel Frame Structure Prefab Building](//www.micstatic.com/athena/img/transparent.png)
Main Materials:
1. Q235,Q345 H section steel structure for columns and beam
2. Pre-embedding anchor bolts for connection columns to foundation
3. Intensive bolts for connection between columns and beams.
4. Wall/roof panel: one layer corrugated steel plate or sandwich panels
5. Windows/door: PVC, aluminum alloy, steel etc.
6. Color steel plate or galvanized steel gutters and PVC tubes for rain water
Production processing
![Hot Sale Warehouse Steel Frame Structure Prefab Building](//www.micstatic.com/athena/img/transparent.png)
Packing and loading cotainer
![Hot Sale Warehouse Steel Frame Structure Prefab Building](//www.micstatic.com/athena/img/transparent.png)
FAQ
1. How to buy your idea products?
A: TT and L/C are acceptable and TT will be more appreciated. 50% deposit before producing, balance before loading by TT.
2. What is the delivery time?
A: It depends on order quantities. Generally speaking, the delivery time will be within 15 to 30 days.
3. How to pack the products?
A: We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.
4. How to install after the goods arriving destination?
A: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.
Prefabricated light steel structure industrial building workshop warehouse construction, please click button " send", we will give our best price !!!
Our service
1. |
Design the building according to requirements |
2. |
Produce every components of the building |
3. |
Quality check |
4. |
Loading containers and ship to destination port |