Shandong, China
Business Type:
Manufacturer/Factory, Trading Company
Registered Capital:
1000 RMB
Plant Area:
>2000 square meters
Management System Certification:
ISO 9001
Average Lead Time:
Peak season lead time: one month
Off season lead time: one month
OEM/ODM Service

Prefabricated House, Steel Structure House, Prefabricated Building manufacturer / supplier in China, offering Steel Structure Warehouse Hangar Building, Chinese Famous Metal Frame Prefabricated Steel Structure Warehouse, Lightweight Steel Frame Prefabricated 2000 Square Meter Prefab Warehouse and so on.

Gold Member Since 2017
Audited Supplier

Steel Structure Warehouse Hangar Building

Get Latest Price
Min. Order / Reference FOB Price
50 Square Meters US $30-80/ Square Meter
Port: Qingdao, China
Production Capacity: 60000 Sqm/Month
Payment Terms: L/C, T/T, Western Union
Type: Multi-Layer Warehouse
Material: Steel
Height: 5m - 15m
Load Capacity per Layer: 150kg - 500kg
Usage: Tool Rack, Beverage, Clothing, Tools, Supermarket, Food, Industrial, Warehouse Rack, Poultry Shed
Serviceability: for Special Purpose

You Might Also Like


Basic Info

Model NO.: Hangar Building
Life of Service: More Than 50 Years
Beam and Column: Q345 H Steel
Purlin and Girt: Z or C Steel
Wind Resistance: Grade 14
Wall and Roof Panel: Steel Sheet or Sandwich Panel
Connection: Bolt Connection
Installation: Installation Drawing or Guide on Site
Door: Sliding Door or Roller Door
Windows: PVC or Aluminum Windows
Product Name: Steel Structure Warehouse Hangar Building
Trademark: DFX
Transport Package: Flat Packed in Container or as Request
Specification: customized
Origin: Qingdao, Shandong, China
HS Code: 9406900090

Product Description

Steel Structure Warehouse Hangar Building 
1. Possess a wide span, with either a single or multiple spans and can have a maximum span clearance distance in 36m without middle columns.
2. Low cost with FOB unit price ranging from USD 30 to USD 80 per square meter according to customer's requirements.
3. The warehouses are also environmentally friendly, having a stable structure, are of earthquake resistance, water proof and energy saving.
4. Widely used as industry factory building, warehouse, gymnasium, poultry shed, school and medical clinic, garage, hangar, etc.
5. Fast construction and easy installation.
6. Has a service life of more than 50 years.
Product Description
Product NameSteel Structure Warehouse Hangar Building 
Main Steel FrameH section steel beam and columns, painted or galvanized, galvanized c section or steel pipe.
Secondary Steel FrameHot dip galvanized c purlin, steel bracing, tie bar, knee brace, edge cover, etc.
Roof or Wall PanelEPS sandwich panel, glass wool sandwich panel, rock wool sandwich panel, and PU sandwich panel or corrugated steel sheet.
Rain DownpipePVC pipe
Doorssliding sandwich panel door or rolling metal door or vertical hinged door
WindowsPVC frame or aluminum alloy frame windows
ConnectingPost feet bolts, anchor bolts, intensive bolts and machine bolts

Need A Quotation? Please send us your drawings or please tell us the following information.
1) Location (where is the construction place? ) _____country/area
2) Size: Length*Width*Height  _____m*_____m*_____m
3) Wind load is ?(max. Wind speed) _____kn/m2 or_____km/h or_____m/s
4) Snow load is ? (max. Snow height) _____kn/m2 or_____mm
5) Brickwall needed or not? If yes, 1.2m high or 1.5m high?
6) Thermal insulation needed? If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; If not, the metal steel sheets will be ok. The cost of the latter will be much lower than the former.
7) Door quantity & size _____sets, _____(width)mm*_____(height)mm
8) Window quanity & size _____sets, _____(width)mm*_____(height)mm
9) Overhead Crane needed or not? If yes, _____sets, max. lifting weight____tons; Max. Lifting height _____m.

1. What are the payment terms?
A: TT,  L/C and Trade Assurance are acceptable and TT will be more appreciated. 50% deposit before producing, balance before loading by TT.
2. What is the delivery time?
A: It depends on order quantities. Generally speaking, the delivery time will be within 15 to 35 days.
3. How to pack the products?
A: We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.
4. How to install after the goods arriving destination?
A: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation and wages will be paid by buyers.
Packaging & Shipping

Send your message to this supplier

avatar Ms. Cherry Wang

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now