Industry Supermarket Steel Structure Warehouse Hangar Building Costs

Product Details
Customization: Available
Type: Multi-Layer Warehouse
Material: Steel

360° Virtual Tour

Diamond Member Since 2017

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

to see all verified strength labels (14)
  • Industry Supermarket Steel Structure Warehouse Hangar Building Costs
  • Industry Supermarket Steel Structure Warehouse Hangar Building Costs
  • Industry Supermarket Steel Structure Warehouse Hangar Building Costs
  • Industry Supermarket Steel Structure Warehouse Hangar Building Costs
  • Industry Supermarket Steel Structure Warehouse Hangar Building Costs
  • Industry Supermarket Steel Structure Warehouse Hangar Building Costs
Find Similar Products

Basic Info.

Model NO.
Hangar Building
Height
5m - 15m
Load Capacity per Layer
150kg - 500kg
Usage
Tool Rack, Beverage, Clothing, Tools, Supermarket, Food, Industrial, Warehouse Rack, Poultry Shed
Serviceability
for Special Purpose
Shelf height
5m~15m
Goods characteristics
Product Warehouse
Function
Chose Type Stereoscopic Warehouse
operation
Artificial Addressing Artificial Loading
Life of Service
More Than 50 Years
Beam and Column
Q345 H Steel
Purlin and Girt
Z or C Steel
Wind Resistance
Grade 14
Wall and Roof Panel
Steel Sheet or Sandwich Panel
Connection
Bolt Connection
Installation
Installation Drawing or Guide on Site
Door
Sliding Door or Roller Door
Windows
PVC or Aluminum Windows
Product Name
Steel Structure Warehouse Hangar Building
Transport Package
Flat Packed in Container or as Request
Specification
customized
Trademark
DFX
Origin
Qingdao, Shandong, China
HS Code
9406900090
Production Capacity
60000 Sqm/Month

Product Description

Industry Supermarket Steel Structure Warehouse Hangar Building Costs
Industry Supermarket Steel Structure Warehouse Hangar Building Costs
Advantages
1. Possess a wide span, with either a single or multiple spans and can have a maximum span clearance distance in 36m without middle columns.
2. Low cost with FOB unit price ranging from USD 30 to USD 80 per square meter according to customer's requirements.
3. The warehouses are also environmentally friendly, having a stable structure, are of earthquake resistance, water proof and energy saving.
4. Widely used as industry factory building, warehouse, gymnasium, poultry shed, school and medical clinic, garage, hangar, etc.
5. Fast construction and easy installation.
6. Has a service life of more than 50 years.Industry Supermarket Steel Structure Warehouse Hangar Building Costs

Product Description
Product Name Steel Structure Warehouse Hangar Building 
Main Steel Frame H section steel beam and columns, painted or galvanized, galvanized c section or steel pipe.
Secondary Steel Frame Hot dip galvanized c purlin, steel bracing, tie bar, knee brace, edge cover, etc.
Roof or Wall Panel EPS sandwich panel, glass wool sandwich panel, rock wool sandwich panel, and PU sandwich panel or corrugated steel sheet.
Rain Downpipe PVC pipe
Doors sliding sandwich panel door or rolling metal door or vertical hinged door
Windows PVC frame or aluminum alloy frame windows
Connecting Post feet bolts, anchor bolts, intensive bolts and machine bolts

 Industry Supermarket Steel Structure Warehouse Hangar Building Costs

Need A Quotation? Please send us your drawings or please tell us the following information.
1) Location (where is the construction place? ) _____country/area
2) Size: Length*Width*Height  _____m*_____m*_____m
3) Wind load is ?(max. Wind speed) _____kn/m2 or_____km/h or_____m/s
4) Snow load is ? (max. Snow height) _____kn/m2 or_____mm
5) Brickwall needed or not? If yes, 1.2m high or 1.5m high?
6) Thermal insulation needed? If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; If not, the metal steel sheets will be ok. The cost of the latter will be much lower than the former.
7) Door quantity & size _____sets, _____(width)mm*_____(height)mm
8) Window quanity & size _____sets, _____(width)mm*_____(height)mm
9) Overhead Crane needed or not? If yes, _____sets, max. lifting weight____tons; Max. Lifting height _____m.

FAQ
1. What are the payment terms?
A: TT,  L/C and Trade Assurance are acceptable and TT will be more appreciated. 50% deposit before producing, balance before loading by TT.
2. What is the delivery time?
A: It depends on order quantities. Generally speaking, the delivery time will be within 15 to 35 days.
3. How to pack the products?
A: We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.
4. How to install after the goods arriving destination?
A: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation and wages will be paid by buyers.
Packaging & Shipping
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier