Shandong, China
Business Type:
Manufacturer/Factory, Trading Company
Registered Capital:
1000 RMB
Plant Area:
>2000 square meters
Management System Certification:
ISO 9001
Average Lead Time:
Peak season lead time: one month
Off season lead time: one month
OEM/ODM Service

Steel Structure Workshop, Warehouse Steel Structure, Steel Structure Building manufacturer / supplier in China, offering Light/Peb/Car Garage/Warehouse/Workshop/Prefab Steel Structure, Lightweight Steel Frame Prefabricated 2000 Square Meter Prefab Warehouse, Large-Span Structures Steel Cold Storage Warehouse Buildings and so on.

Gold Member Since 2017
Audited Supplier
Supplier Homepage Products steel structure warehouse/ workshop building Light/Peb/Car Garage/Warehouse/Workshop/Prefab Steel Structure

Light/Peb/Car Garage/Warehouse/Workshop/Prefab Steel Structure

Get Latest Price
Min. Order / Reference FOB Price
100 Square Meters US $30-80/ Square Meter
Port: Qingdao, China
Production Capacity: 1 Set
Payment Terms: L/C, T/T, Western Union
Type: H-Section Steel
Standard: GB, ASTM
Trademark: Quality Carbon Structural Steel and Alloy Structural Steel, DFX
Forming: Hot-Rolled Steel
Connection Form: Bolt Connection
Member: Steel Column

You Might Also Like


Basic Info

Model NO.: DFXSS1001
Type of Steel For Building Structure: High-Strength Steel
Carbon Structural Steel: Q235 Q345
Application: Steel Workshop, Steel Structure Platform, Steel Fabricated House, Structural Roofing, Frame Part, Steel Walkway and Floor, Steel Structure Bridge
Life of Service: More Than 50 Years
Surface Processing: Painted or Galvanized
Installation: Installation Drawing or Guide on Site
Certificatte: ISO, Coc,SGS
Wind Resistance: Grade 14
Transport Package: Flat Packed in Container or as Request
Origin: Qingdao, Shandong, China
HS Code: 7308900000

Product Description

Light/Peb/Car Garage/Warehouse/Workshop/Prefab Steel Structure


1, Attractive design
Beautiful and elegant looks, use the color steel sandwich panel, the material is polystyrene foam
2, Easy to assemble and dismantle
Can be rebuilt for dozens of time with plugs and screw
3, Firm structure
Steel frame structure and sandwich panels
4, Durable
The steel frame parts are all processed with anti-corrosion coating and can be used for as long as 30 years
5, Reduce cost by integrating &manufacturing &service processes.
6, With reliable quality and efficient service Offer one-stop service from developing, design,
manufacturing to installation
7, Sizes and design are according to requirements

Light/Peb/Car Garage/Warehouse/Workshop/Prefab Steel Structure
Light/Peb/Car Garage/Warehouse/Workshop/Prefab Steel Structure
Main Components
1main steel frameQ235 Q345 steel H beam and comlumns, painted or galvanized, box steel, galvanized C section or steel pipe
2.Secondary frame :galvanized C or Z purlin , steel bracing , tie bar , knee brace , flashing etc.
.Roof panel :EPS sandwich panel , glass fiber sandwich panel , rock wool sandwich panel , and Pu sandwich panel or steel sheet
 Wall panel :Sandwich Panel or Corrugated Steel Sheet
 Tie Rod:Circular Steel Tube
 Brace:Round Bar
 Knee Brace:Angle Steel
 Roof Gutter:Color Steel Sheet or Galvalume sheet
 Rainspout:PVC Pipe
3.Door:Sliding Sandwich Panel Door or rolling Metal Door
 Windows:PVC or Aluminum Alloy Window
 Connecting:Anchor bolts, intensive bolt , galvanized machine bolt, self-drilling screws
4.Packing:according to the pack list made by our engineer
5.Drawing:We can supply structural steel engineering design and instalaltion drawing

Light/Peb/Car Garage/Warehouse/Workshop/Prefab Steel Structure
Light/Peb/Car Garage/Warehouse/Workshop/Prefab Steel Structure

Checking Cost Of steel structure, Please Give Us The Information
(1) Dimension: Length, width, height, eave height, roof pitch, etc.
(2) Doors and windows: Dimension, quantity, position.
(3) Local climate: Wind speed, snow load, seismic magnitude etc.
(4) Insulation material: Panel type, sandwich materials, sandwich thickness
(5) crane metal structures: if have overhead crane, please tell the lifting height and lifting weight.
(6) Is there any materials that are not allowed to import to the country where the structure is planning to use?
(7) If you have other requirements, such as fire proofing, insulated roof, etc. Please also inform us.
(8) It's better if you have your own drawings or pictures. Please send them to us.

Director Co.,Ltd is a China based manufacturer of steel structure building, prefabricated house and related steel products. Our products include the prefabricated house, steel structure building such as warehouse, workshop, dormitories, etc.) Container house, modular house, sandwich panels and so on. e have exported our products to over 40 different countries around the world. We have our own engineers who can provide the perfect designs according to the customers' demand.

We are an ISO9001 registered company, and we produce the products in Chinese National Standard, international standard, and customer's special request.
Light/Peb/Car Garage/Warehouse/Workshop/Prefab Steel Structure


1.Common type of the industrial building?
eply:Portal frame is the usual type in the industrial workshop and warehouse shed.Other types also could be designed and manufacturer as per clients's equest.
2.What's the quality grade of the steel structure components?
Reply:Q345 is used for main steel structure,Q235 is used for secondary steel structure.
3.How about the delivery time?
Reply:Usually,within 25-60 days after the order confirmed,also depends on the fabrication quantity.
4.How about the derust grade?
Reply:Ball blasting Sa2.5 on main steel structure manual derust St2.0 on secondary steel structure.
5.What kind panel used for the roof and wall?
Reply: Color corrugated steel sheet and sandwich panl could be used.Sandwich panel performs well on the heat insulation,sound insulation.Common sandwich materials are EPS,glass wool and PU.
6.How to install it?
Reply: We will furnish you the detailed construction drawing and theconstr uctionmanual
which could help you to erect and install the building step by step.We also could send the engineer your local to help you if needed.
Reply:Finish paint need be done after the frame installed,and do it again after 6-8 months.So the surface willstay m ore time.

Light/Peb/Car Garage/Warehouse/Workshop/Prefab Steel Structure


Send your message to this supplier

avatar Ms. Maggie Zhu

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now