Material: | Steel Structure |
---|---|
Usage: | Warehouse, Villa, Dormitories, Temporary Offices, Workshop |
Certification: | ISO |
Customized: | Customized |
Life of Service: | More Than 50 Years |
Surface Processing: | Painted or Galvanized |
Customization: |
---|
Suppliers with verified business licenses
Prefabricated Steel Structure Poultry House Main Material: |
Column and beam | material Q345B & Q235BH section steel ( painted or galvanized) or square tube |
Wall&roof purlin | c or z section steel, size from c120~C320, z100~Z200 |
Wall&roof panel | colorful corrugated steel sheet(or with insulation material) ,Sandwich panels with eps, rockwool, fiber glass, pu etc. |
Supporting | steel angle, steel pipe, steel round. |
Gutter | steel sheet or galvanized steel sheet |
Rainspout | pvc pipe |
Door | sliding sandwich panel door or rolling metal door |
Accessory | anchor bolt,high strengthen bolt, normal Bolt, skylight Belts, ventilators, etc. |
1.Common type of the industrial building? Reply:Portal frame is the usual type in the industrial workshop and warehouse shed.Othertypes also could be designed and manufacturer as per clients's equest. |
2.What's the quality grade of the steel structure components? Reply:Q345 is used for main steel structure,Q235 is used for secondary steel structure. |
3.How about the delivery time? Reply:Usually,within 25-60 days after the order confirmed,also depends on the fabricationquantity. |
4.How about the derust grade? Reply:Ball blasting Sa2.5 on main steel structure manual derust St2.0 on secondary steel structure. |
5.What kind panel used for the roof and wall? Reply: Color corrugated steel sheet and sandwich panl could be used.Sandwich panelperforms well on the heat insulation,sound insulation.Common sandwich materials are EPS,glass wool and PU. |
6.How to install it? Reply: We will furnish you the detailed construction drawing and theconstr uctionmanual which could help you to erect and install the building step by step.We also could send the engineer your local to help you if needed. |
7.Maintenance: Reply:Finish paint need be done after the frame installed,and do it again after 6-8 months.So the surface willstay m ore time. |
Suppliers with verified business licenses